How tanks fail · 3 min read
Settlement and foundations
Tanks sink, and how they sink matters more than how far.
When the ground under a tank compresses, the tank settles. Even settlement is usually harmless. Tilt and uneven settlement strain the shell, bottom and piping, and can jam floating roofs. It is measured by surveying elevations around the tank over time.
- Uniform settlement lowers the whole tank evenly and mostly affects connected piping.
- Planar tilt and differential settlement distort the shell and can stress the bottom and welds.
- Local settlement under the edge or floor can cause depressions and cracks.
- Survey elevations around the base at set intervals, and compare them with earlier surveys.
Every tank settles a little as the ground under it compresses under the weight of the tank and its contents. Most of it happens in the first few fills, and a well-prepared foundation settles evenly and predictably.
What matters is the shape of the settlement. If the whole tank sinks by the same amount, the structure is not strained, though piping attached to it can be. If one side sinks more than the other, the tank tilts. If different spots settle differently, the shell and bottom are forced to bend. The shell can go out of round, welds can be stressed and the floor can dish, buckle or crack.
Settlement is measured with a level survey. Elevations are taken at equal intervals around the circumference at the base of the shell, and compared with a straight line or a plane fitted to them. The same survey repeated over the years shows whether settlement is stable or still going, which is more important than any single number.
API 653 includes a method to evaluate bottom settlement and to decide whether the movement is acceptable or needs correction. Corrections may be to jack and re-level the tank, repair the foundation or repair the affected plates.
Floating roofs make settlement visible. A roof that catches, an uneven rim seal gap, or a shell that is out of round are often the first clues that the foundation is moving.
Good practice
- Take elevation measurements at equal spacing around the circumference and record the date.
- Note any gap or movement at nozzles, pipe supports and the ring wall.
Avoid
- Do not judge settlement from one survey; the trend matters.
- Do not forget the effect on a floating roof, which can bind as the shell goes out of round.
In the field
A roof that sticks at one point on every cycle, or an annular gap that changes around the circumference, can point to tilt or an out-of-round shell. Survey before you blame the roof.
- Differential settlement:
- different parts of the tank settling by different amounts.
- Out of round:
- a shell that is no longer a true circle.
Based on: API 653. A summary for learning. The standard and your site procedures govern.
Preparing for an exam? Take it with you.
The EIM app has study notes, practice questions with explanations, timed mock tests and your progress, on your phone. Free to download. Android first, iPhone to follow.