Welcome to Excellence Integrity Management - Empowering Professionals Globally.

Emerging Skills Program — no certification exam

Well Integrity Management

Barrier thinking applied to wells: what the envelopes are, how to prove they are intact, and what to do the day one of them fails.

4 days
Duration
Live or in-house
Format
None
Certification

Why this matters

The problem this solves

A well is the only asset on a facility where the containment barrier is buried three kilometres underground and cannot be inspected the way a vessel can.

Well integrity is managed through barriers rather than through inspection, and that changes almost everything about how the work is done. NORSOK D-010 and ISO 16530-1 both frame it the same way: two independent envelopes between the reservoir and the environment, each with a defined element list, each verifiable, each with a stated action when it is lost.

The gap this programme fills is the one between the standard and the operation. Most teams can name the barrier elements. Far fewer have a defensible answer to sustained casing pressure on a specific well on a specific morning, or a written well-integrity status that an auditor and a driller would read the same way.

Before you enrol

Is this a certification?

The short answer is no, and it is worth being explicit about it rather than leaving it to be discovered later.

What this programme gives you

  • Four days of instruction from engineers who manage well stock, not career trainers
  • Barrier diagrams built during the programme for real completion types
  • A working annulus-pressure diagnostic sequence you can take back
  • An EIM certificate of completion

What it does not

  • Not preparation for a certification exam — no certifying body examines this subject
  • No API, AMPP or CSWIP credential at the end
  • Not a well control certification, and not a substitute for IWCF or IADC
  • Not a substitute for your operator’s own well integrity management system

If you need a recognised credential, start at certification exam preparation.

Who it's for

Roles this is built around

Well integrity engineers

Operating side

Owning the barrier status of a stock of wells and the evidence behind it.

Production and completions engineers

Any level

Making the intervene-or-monitor call when an annulus starts to build pressure.

Asset integrity managers

Cross-discipline

Answerable for wells alongside fixed equipment, without a wells background.

What it covers

The outline

An outline, not a weighted Body of Knowledge — nobody publishes weights for a subject with no exam behind it.

M01

Barriers, not inspections

Why wells are managed by envelope rather than by thickness reading, and what follows from that.

M02

The two-barrier philosophy

Primary and secondary envelopes, element by element, from reservoir to surface.

M03

Barrier element verification

What counts as proof for each element, and the tests that only look like proof.

M04

Annulus pressure management

Sustained casing pressure, thermal versus communication, and the diagnostic sequence.

M05

Well integrity status and reporting

Classifying a well, and writing a status an auditor and a driller both read the same way.

M06

Intervention and abandonment

When a well must be shut in, what a repair has to restore, and the barrier case for abandonment.

Outcomes

What you will be able to do

  • Draw the barrier envelopes for a real well completion and name every element in each
  • Decide what constitutes acceptable verification for each element, and what does not
  • Diagnose sustained casing pressure and choose between monitoring, bleeding down and intervening
  • Classify a well’s integrity status against a defined scheme and defend the classification
  • Write a well integrity report that supports an operating decision rather than restating data

Standards referenced

What the programme works from

StandardWhat we use it forNote
NORSOK D-010Well integrity in drilling and well operationsThe primary reference
ISO 16530-1Well integrity — life cycle governance
API RP 90Annular casing pressure management for offshore wellsUsed for the SCP module
API RP 14BSubsurface safety valve systemsVerification of a key barrier element

How it runs

Ways to take it

Formats offered — not scheduled dates. Live cohort dates live on the course page, so there is only ever one copy of a date.

FormatDurationGroup sizeNotes
Live online4 daysUp to 15Split across sessions rather than run as consecutive full days
In-houseBy arrangement6–20Delivered against your own equipment, your own findings and your own procedures

FAQs

Questions people ask first

No, and the distinction matters. Well control is about regaining control of a well during drilling or intervention, and it is certified — IWCF and IADC both examine it. Well integrity is about proving and maintaining barriers across the whole producing life of the well, and no certifying body examines it.

No. The programme starts from the barrier concept rather than from drilling practice, which is deliberate — a good part of the audience is asset integrity people who have inherited responsibility for wells without ever having worked one.

NORSOK D-010 and ISO 16530-1 as the primary frames, with API RP 90 for annular pressure. Where they differ, the differences are pointed out rather than smoothed over — that gap is usually where the real operating question lives.

Want the full outline?

Tell us your role and what you are trying to fix, and we will send the programme outline and what it would take to run it for your team.